Compare roofing quotes

A lower total can contain a smaller scope. Use two written proposals to record what each includes, what it excludes, and what still needs an answer.

Entries stay in this browser tab and are lost when it reloads. Print the reviewed result to keep a copy. Nothing entered here is uploaded or sent to analytics.

Proposal A
Proposal B
Roof covering and accessories

Which manufacturer, product line, underlayment, starter, and ridge products and quantities are specified?

Measured area and work limits

Which roof planes and structures are included? Is the quantity measured surface or surface plus waste?

Tear-off, disposal, and cleanup

How many existing layers, which disposal charges, and what daily and final cleanup are included?

Decking and concealed damage

What inspection, repair allowance, unit prices, photographs, and written change approvals are required?

Flashing and penetrations

Which walls, valleys, chimneys, skylights, pipe boots, and other flashings are replaced or reused?

Ventilation and insulation

What assessment and specified changes are included, and who confirms the proposed assembly?

Access and property protection

Who provides staging, equipment, landscaping protection, and weather protection during the work?

Permits, inspections, and taxes

Who obtains permits and inspections, and are all applicable fees and taxes in the total?

Warranty responsibilities

Who covers workmanship and materials, for how long, with which exclusions and registration obligations?

Schedule, payments, and closeout

What are the start/completion terms, payment milestones, change process, and required closeout documents?

Fill in the known details, then review the comparison.

How to use the worksheet

  1. Use “Proposal A” and “Proposal B” or your own short labels. You do not need to enter a name, address, or contact details.
  2. Copy the total and measured roof surface from each proposal. Use the same currency and square feet for both; use surface area before ordering waste.
  3. For each scope item, select only what the written proposal actually confirms. “Unknown” is the correct answer when the language is missing or unclear. Record quantities, limits, and responsibilities in the notes.
  4. Review the comparison and take its open questions to each contractor. Get clarifications and revised scope in writing before evaluating the price difference.

A completed example: decking allowance

Proposal A says “deck replacement excluded; unit price to follow.” Mark decking Excluded and ask for the unit, unit price, documentation, and approval process. Proposal B says “includes three 4 × 8 panels; extra panels at the stated unit price.” Mark Included with a limit and record the panel count and extra-work terms. Those bids still do not contain the same deck-repair scope.

What the result means

Price per square foot is the entered proposal total divided by its stated roof surface. It does not correct for omitted work, differing materials, taxes, or hidden conditions. A blank price or area remains unknown, and no contractor score or automatic winner is produced. The worksheet cannot authenticate a contractor, interpret a contract, or verify a roof measurement.

Worksheet v1.0.0 · September 8, 2026. Print provides an HTML-equivalent record using your browser; no upload, account, or persistent storage is used.

All roofing tools · Formulas, sources, and limits